Skip to content
NIRMETRATechnical drawing support

Fire Drawings

Fire NOC and fire-fighting layouts prepared to NBC requirements, with egress, compartmentation and equipment clearly shown.

Fire drawings are reviewed closely, and for good reason. Exit widths, travel distances, refuge areas and equipment positions all have to be shown clearly and add up.

We prepare fire NOC and fire-fighting drawings to the National Building Code (Part 4) and the requirements of the fire authority, working from your architectural set so the two stay consistent.

Send a Project

Scope

What’s included

  • Fire NOC drawing set

    Plans, sections and site plan marked up with fire-safety provisions for submission.

  • Means of escape

    Exit routes, travel distances, staircase and exit widths, and occupant load calculations.

  • Compartmentation

    Fire-rated walls, doors, shafts and refuge areas identified and scheduled.

  • Fire-fighting layouts

    Hydrant, sprinkler, extinguisher, detection and alarm layouts, coordinated with the fire consultant where involved.

  • Fire tender access

    Driveways, turning radii and hard-standing shown on the site plan.

  • Compliance statements

    Tabulated fire requirements vs provisions for the reviewing officer.

Audience

Who it’s for

  • Developers of commercial, group housing and mixed-use projects needing fire NOC before occupation.

  • Institutions such as schools and hospitals, where occupancy classification drives stricter requirements.

  • Industrial clients with warehouses and plants that need fire-fighting layouts and access planning.

Deliverables

Deliverables & formats

Deliverables and file formats
DeliverableFormat
Fire NOC setDWG + PDF
Occupant load & egress calculationsXLSX + PDF
Compliance statementPDF
Submission printsPDF to authority sheet sizes

Process

How we produce fire drawings

  1. 1

    Classification

    Occupancy, height and area confirmed to set the applicable requirements.

  2. 2

    Egress & layout

    Escape routes, compartments and equipment positions drafted on the architectural base.

  3. 3

    Check

    Travel distances, exit widths and provisions checked and tabulated.

  4. 4

    Submission set

    Final drawings and statements issued, with revisions against fire-officer comments.

FAQs

Common questions

Anything else? Call or message us and you’ll speak to someone who draws.

Ready to get started?

Need fire drawings?

Share your requirements and our team will suggest the best way forward.

Start a Project
  • Quick
    Response
  • Technical
    Expertise
  • Confidential
    & Reliable